Monday, 10 April 2017

Unit 6: critical approaches task 1 pt 2


Unit 6 Critial approaches task 1


Unit 6: Film debate and analysis- Chosen films

Chosen films
·        Django Unchained-2013 Rated: 18
·        Abraham Lincoln The vampire hunter- 2012 Rated: 15


Django unchained 

Brief of film
Django is a freed slave, who under the tutelage of a German bounty hunter becomes a hunter himself. After taking down some bad guys for profit they track down Django’s wife and liberate her from an evil plantation owner.
Director- Quentin Tarantino

Starring
·        Jamie Foxx
·        Christoph waltz
·        Leonardo DiCaprio
·        Samuel L Jackson
·        Kerry Washington

Abraham Lincoln the vampire hunter

Brief of film
While still a boy Abraham loses his mother at the hands of a vampire and vows revenge, but fails narrowly escaping with his life. He meets henry a bounty hunter who shows Abe the art of killing vampires, which continues throughout his adult life.
Director- Timur Bekmambetov

Starring
·        Benjamin walker
·        Dominic cooper
·        Anthony Mackie
·        Mary Elizabeth Winstead
·        Rufus Sewell 

Wednesday, 15 March 2017

unit 23:multi-cam production evaluation





Before the official production our group had a practice run of the TV show to ensure that the recorded show ran smoothly without any errors or complications. The show ran for eighteen minutes with the thirty second add breaks timed in. The equipment we had used was three cameras one in the middle of the studio and two on either side, although we only has two camera men the floor manager had made sure that the middle camera was recording and was focused. We had tables and chairs for the contestants and setting up the sound which took 15 minutes to do.

In my roles as Production manager I had made sure that all of the cast knew what they had to do and which order the games were in as well as making sure that they had a microphone, iPad and iPad stand on the tables. I also had to make sure that the host knew which order everything was in, that he had a microphone and he had his question card in his hand. As well as being a PM I was also in charge of the TelePrompTer making sure that the script was correct and ensuring that the speed was at a pace that the host could read it.
 
During the post production the recorded sound was not correct therefore we had to use the practice clips for sound and the official footage for the camera edits and the better quality footage adding the images and extra clips to the video.
 
From this production I have learned about the various roles needed to create a good production team and final product, although there was some complications they were looked over and settled during this production.