Monday, 12 December 2016

Unit 23: Multi-Camera Techniques Brief - Regular Production Week 9





Week 9 - 12/12/16 9:00am
Keeley has finally completed the script and as a group we reviewed it. We discussed the teams and who should be in what team. We also thought about the different type of commercials that we can. Our final choice was Musical.ly Ad. Berfin came up with the idea of adding a 10 second of thought from each other after the first round. Zak also had the idea of adding see you after break.
Team One
Dianni
Daisy
Lucy
Team Two
Jacira
Dimitar
Nat
Host
Tim

pre-production primary research



pre-production- script





Wednesday, 7 December 2016

Unit 23: Multi-Camera Techniques Brief - Regular Production Week 8




Date & Time
Discussion and Topic of the meeting
Week 8 - 07/12/16 11:40am
Finally, the script has been completed so as group we read and discussed the script and the error that has been made. As the script was really short half of the team was confused so we decided to make a point system and finalised the three games included in the show. We also discussed our job roles in the production.

Director -  Dani
Vision Mixer - Berfin
Floor Manager - Maarya
Cam 1 - Timi
Cam 2 (Main)- Vic
Cam 3 - Abi
Sound - Zak
Lighting - Chai ann
Tech/Monitor - Keeley

The script needs a lot of work eg - structure of rounds
Round 1 - Meme Challenge (3 rounds of images/video create a meme for then upload to instagram for likes, most likes wins)
Round 2 - Snapchat Stories (60 second story using selected theme, filters. Audience pick most funny - watch on phones/TV MONITOR)
Round 3 - Music.ly challenge both teams create 30 sec vid of the themed song 'All I Want For Christmas' Mariah Carey. Voting is the same.

System Point - By Likes on social media
Three games - Memes, Musically, Snapchat Filter.

pre-production- set design part 2

pre-production set design part 1


pre-production- studio plan

pre-production- risk assesment



pre-production- recce







pre-production- budget

Expenses & Jobs roles Amount of No. Price of EachTotal
Rent studio 1£40 Per Hour (10hr) £400
Equipments E.g Cameras, 5 ipads £379£1,895
Food 0£0£0
Travel 0£0£0
Costumes/ Materials 0£0£0
Producers 1£195 (Per Hr) 1,950
Director 2£155 (Per Hr)£1,550
Cast7£15 (Per Hr) £1,050
Production Staff9£25 (Per Hr)£2,250
Camera Operator3£45 (Per Hr)£1,350
Lighting Techician 1£25 (Per Hr)£250
Production Manager1£35 (Per Hr)£350
Script Supervisor2£65 (Per Hr)£1,300
Costume Design1£24 (Per Hr)£240
Hair/Make up 1£24 (Per Hr)£240
Editor4£65 (Per Hr)£2,600
Sound Operator 1£35 (Per Hr)£350
Floor Manger 1£25 (Per Hr)£250
£16,025
Budget = £20,000

pre-production- story board












Friday, 18 November 2016

production meeting week 7

Date & Time
Discussion and Topic of the meeting
Week 7 - 28/11/16 9:00am
This morning as a group we discussed deadlines and how it could be complete by Wednesday 30th . Berfin asked anyone who needed help or support with their pre-production and distributed any work between Victor, Maarya and Berfin as they are done.

Lighting Plan - Berfin

Set Design & Proplist - Dani
Secondary Research - Dani

Tuesday, 15 November 2016

production meeting week 6

Date & Time
Discussion and Topic of the meeting
Week 6 - 15/11/16 10:20am
In this reporting meeting, we spoke about what had to be done and when.
Tasks that needs to be completed
Dani - Props list and set design( Including logos) & Secondary Research Evidence
Keeley- Primary Research Evidence , script
Victor -   Shooting- Camera Script
Chai-ann- Production Schedule & Shooting- Camera Script
Timi - Linking and inserts, script
Zak- Shot list, Logo
Abigail - Production Schedule, Lighting Plan

unit 23: multi-cam production studio diary (15/11/16)







This was our first camera set up, and it included 3 IPads and 3 tripods.Tom and Tyler showed us the apps and the features that it had such as the fades and discover. This app allowed the Ipads and the Visual Mixer to be connected during filming.

This allowed me to have more knowledge about the app as it was new to us, although I will not be using this equipment due to my job role I still learned about it just in case I needed to take over if someone was not in

Monday, 14 November 2016

production meeting week 5



Date & Time
Discussion and Topic of the meeting
Week 5 - 14/11/16 9:00am
This morning we discussed what was complete for the pre-production.For an example, Berfin, Victor, Zak and Maarya was done with their individual task and started to work with other. Another example, Berfin is starting and designing the logo with Zak.

Complete Pre-production

Berfin  - Budget & Reece
Victor - Equipment & Reece
Maarya - Storyboard
Zak - Studio Floor Plan

Unit 23:Multi-camera techniques studio diary (14/11/16)

Dear Diary,


today was the dead line and some of the work was uploaded to peoples blogs and shared to the google drive account that I had created, but not all of the work was uploaded due to not being complete so we had missed the deadline and that is an issue that everyone who worked independently will be trying to work harder for. overall no one is to blame for the missing deadline and the pre-production will be completed soon

Friday, 11 November 2016

production meeting week 4

Date & Time
Discussion and Topic of the meeting
Week 4 - 09/11/16 11.10am
Today we discuss the main part of the pre-production as we had a deadline on the 14th of November. Everyone team member given a little update where they were on the pre-production.
Storyboard
Equipment check
Research evidence
Location recce

Wednesday, 9 November 2016

unit 23: multi- cam- studio diary 09/11/16

Dear diary,


we had a meeting to discus what tasks had been completed and which tasks had not been finished. The tasks that had been completed were
  • Berfin- budget, recce and reporting on-going meetings
  • Victor- equipment checklist and recce
  • Maarya- story board
  • zak- studio plans 

Tuesday, 8 November 2016

production meeting week 3

Date & Time
Discussion and Topic of the meeting
Week 3 - 08/11/16 11.40am

This week we decided as a group to give out individual

al task.

Dani - Props list and set design( Including logos) & Secondary  Research Evidence
Berfin - Budget & Regular Production Meeting (Regular blog post), Reece, Logo
Keeley- Primary Research Evidence , script
Victor -   Shooting- Camera Script, Equipment checklist , Reece
Maarya- Storyboard & Risk assessments
Chai-ann- Production Schedule & Shooting- Camera Script
Timi -Linking and inserts, script
Zak- Shot list, Studio floor plans, Logo
Abigail - Production Schedule, Lighting Plan


Monday, 7 November 2016

Unit 23: Multi camera studio diary (07/11/17)

Dear Diary

7/11/16
Today as a group we had to allocated the team individual roles and then discussed more in detail about the task set for each roles taking into consideration cross overs.
I took the role of primary research and script writer
This week we decided as a group to give out individual task.



Dani - Props list and set design( Including logos) & Secondary  Research Evidence
Berfin - Budget & Regular Production Meeting (Regular blog post) 
Keeley- Primary Research Evidence , script  
Victor -   Shooting- Camera Script, Equipment checklist
Maarya- Storyboard & Risk Assessment
Chai-ann- Production Schedule & Shooting- Camera Script
Timi - Location Recce, Linking and inserts
Zak- Shot list, Studio floor plans 
Abigail - Production Schedule, Lighting Plan

Wednesday, 2 November 2016

production meeting week 2



Date & Time
Discussion and Topic of the meeting
Week 2 - 02/11/16 10:20am
We had our second meeting where we discuss our TV show and the different types of close we can use and includes in our show. For an example,we liked the idea of having close up of the iPad in the show and most likely we will need to pre-record these clips and insert them on the production day.

Tuesday, 1 November 2016

unit:23 Multi- camera techniques brief- studio diary (01/11/17)

Dear diary,


Today our class has selected the two multi-cam shows that we were going to produce and them our teacher split the class up into two groups and we were given one of the shows to produce. The TV show that my group was given was social challenge, which is a game show based on social media.


during our production meeting we decided on what pre-production tasks we wanted to complete, I had chosen to write the script and to do primary research.


These are the members in our group and the roles they wanted to do:
  • Dani- props list, set design, secondary research
  • Berfin- budget, regular and production meetings
  • Keeley- primary/ secondary research and script
  • Victor - camera script and equipment checklist
  • Maarya- story board and risk assessment
  • Chai-ann- production schedule and camera script
  • Timi- location recce, links and inserts
  • zak- shot list and studio floor plans
  • Abigail- production schedule and lighting plan


Monday, 31 October 2016

Production meetings week 1


Week 1 -31/10/16 10:20am
 
 
 
 
 
 
This was our first meeting as a group. We discussed what the content of the show was and how we can set up the TV room for it. Overall, we plan what each role was and what had to be done for it.
Sourced from Keeley’s Blogger
my idea is to use social media to create a game show, there will be two teams of three and each team will compete to create funny and creative images and videos using social sites such as snapchat, tumblr and music.ly. the ages will range from 15-25 and the watershed will be from 9:30pm.

Monday, 10 October 2016

Unit 23: Multi-camer techniques-Brief

social challenge



       my idea is to use social media to create a game show, there will be two teams of three and each team will compete to create funny and creative images and videos using social sights such as snapchat, tumblr and music.ly. the ages will range from 18-25 and the watershed will be from 9:30pm

Unit 23 Multi-camera techniques- Multi cam Idea


Tuesday, 4 October 2016

Unit 23: multi-cam production- regular production meeting week 10

Week 10 - 04/11/16 9:00am
This was our first time in the TV studio we practice our show. In the beginning we didn’t have the script and right papers so next week we must be prepare. Also everyone needs to know their roles and discuss with the group if you want to change it. As we had a issue with one of the crew member of a confusion of their role.
Just a reminder of your job roles - However this is will but do discuss it with the group.
Director -  Dani
Vision Mixer - Berfin
Floor Manager - Maarya
Cam 1 - Timi
Cam 2 (Main)- Vic
Cam 3 - Abi
Sound - Zak
Lighting/ Teleprompter - Chai ann
Tech/Monitor - Keeley