Wednesday, 25 January 2017

unit 23: multi-cam production studio diary/ meeting



This was our final run through before the show was being recorded properly, which went extremely well and was organised. we had to allocate our individual roles so that everyone knew what they had to do within the group. we all performed very well and worked at a professional standard. Getting the studio set up for out show took 15 minutes and all the paperwork that was needed was ready and given to those who needed it.

even though my only job was PM I had set up the equipment, got the set ready and I had set up the TelePrompTer and I was in charge of moving it while the host was reading from it.

No comments:

Post a Comment